Maths-
General
Easy
Question
Place a scalene triangle in a coordinate plane in a way that is convenient for finding side lengths. Assign
coordinates to each vertex.
Hint:
Use the properties of a scalene triangle..
The correct answer is: Hence we use 3 different variables.
Complete step by step solution:
In a scalene triangle, all the 3 sides are of different length. Hence we use 3 different
variables.
Related Questions to study
Maths-
A gardener buys two kinds of fertilizer. Fertilizer A contains filler materials by weight and Fertilizer B contains filler materials by weight. Together, the fertilizers bought by the gardener contain a total of 240 pounds of filler materials. Which equation models this relationship, where x is the number of pounds of Fertilizer A and y is the number of pounds of Fertilizer B?
A gardener buys two kinds of fertilizer. Fertilizer A contains filler materials by weight and Fertilizer B contains filler materials by weight. Together, the fertilizers bought by the gardener contain a total of 240 pounds of filler materials. Which equation models this relationship, where x is the number of pounds of Fertilizer A and y is the number of pounds of Fertilizer B?
Maths-General
Maths-
State and prove the Midsegment Theorem.
State and prove the Midsegment Theorem.
Maths-General
Maths-
Find the midpoint and length of each side using the placement
below. What is the advantage of using 2h instead of h for the leg lengths?
Find the midpoint and length of each side using the placement
below. What is the advantage of using 2h instead of h for the leg lengths?
Maths-General
Maths-
A sum of Rs. 4,000 is lent for 5 years at the rate of 15% per annum. Find the simple interest.?
A sum of Rs. 4,000 is lent for 5 years at the rate of 15% per annum. Find the simple interest.?
Maths-General
Maths-
Place a rectangle in a coordinate plane in a way that is
convenient for finding side lengths. Assign coordinates to each vertex.
Place a rectangle in a coordinate plane in a way that is
convenient for finding side lengths. Assign coordinates to each vertex.
Maths-General
Maths-
MN is the midsegment of △ ABC.
Find MN.
Also, find AC if CN = 35 cm
MN is the midsegment of △ ABC.
Find MN.
Also, find AC if CN = 35 cm
Maths-General
Maths-
In △ ABC, AM ≅ BM
BQ ≅ QC
Prove that MQ ∥ AC.
In △ ABC, AM ≅ BM
BQ ≅ QC
Prove that MQ ∥ AC.
Maths-General
Maths-
Write a coordinate proof.
Any right isosceles triangle can be subdivided into a pair of congruent right isosceles triangles.(Hint: Draw the segment from the right angle to the midpoint of the hypotenuse.)
Write a coordinate proof.
Any right isosceles triangle can be subdivided into a pair of congruent right isosceles triangles.(Hint: Draw the segment from the right angle to the midpoint of the hypotenuse.)
Maths-General
Maths-
NQ, MN and MQ are the midsegments of △ ABC. Find BM.
NQ, MN and MQ are the midsegments of △ ABC. Find BM.
Maths-General
Maths-
MN is the midsegment of △ ABC.
Find MN if BC = 35 m.
MN is the midsegment of △ ABC.
Find MN if BC = 35 m.
Maths-General
Maths-
MN is the midsegment of △ ABC.
Find BC if MN = 17 cm.
MN is the midsegment of △ ABC.
Find BC if MN = 17 cm.
Maths-General
Maths-
In the figure above, RT = TU. What is the value of x?
In the figure above, RT = TU. What is the value of x?
Maths-General
Maths-
For the graph below , write an inequality and explain the reasoning :
Note:
We do not use < or > for infinity in inequalities, since the variable extends to infinite and has no real fixed value.
For the graph below , write an inequality and explain the reasoning :
Maths-General
Note:
We do not use < or > for infinity in inequalities, since the variable extends to infinite and has no real fixed value.
Maths-
In what time will Rs 10000 earn an interest of Rs. 12600 at 18% per annum simple interest?
In what time will Rs 10000 earn an interest of Rs. 12600 at 18% per annum simple interest?
Maths-General
Maths-
The formula below is often used by project managers to compute E, the estimated time to complete a job, where O is the shortest completion time, P is the longest completion time, and M is the most likely completion time.
Which of the following correctly gives P in terms of E, O, and M?
The formula below is often used by project managers to compute E, the estimated time to complete a job, where O is the shortest completion time, P is the longest completion time, and M is the most likely completion time.
Which of the following correctly gives P in terms of E, O, and M?
Maths-General