Maths-
General
Easy
Question
The required staff to student ratio for an excursion is 2 : 15. If 10 teachers attend the excursion, what is the maximum number of students who can attend?
Hint:
Unitary method: The unitary method is a method in which we find the value of a unit and then the value of a required number of units. For example, If 10 apples cost is 100 rupees, 1 apple will cost 10 rupees and if we are asked to find the cost of 100 apples, we can find it by multiplying 100 with the cost of 1 apple.
The correct answer is: 75 students
The teachers to students for an excursion ratio is given as 2:15 or we can write
We are asked to determine the maximum number of students who can attend an excursion if 10 teachers attended the excursion.
So, =
No. of students = = 75 students.
Final Answer:
Hence, the maximum number of students who can attend an excursion is 75 students.
Related Questions to study
Maths-
Julie and Jeanette enjoy finishing their 6 km morning run together. Julie runs at an average speed of 10 km/h and Jeanette runs at an average speed of 3 m/s. If Julie leaves at 8 a.m., at what time should Jeanette leave if they are to finish their run at the same time?
Julie and Jeanette enjoy finishing their 6 km morning run together. Julie runs at an average speed of 10 km/h and Jeanette runs at an average speed of 3 m/s. If Julie leaves at 8 a.m., at what time should Jeanette leave if they are to finish their run at the same time?
Maths-General
Maths-
Find the values of a and b :
Find the values of a and b :
Maths-General
Maths-
if . Then, find the values of a and b.
if . Then, find the values of a and b.
Maths-General
Maths-
A rainfall of 0.896 cm was recorded in 7 hours. What was the average amount of rainfall per hour?
A rainfall of 0.896 cm was recorded in 7 hours. What was the average amount of rainfall per hour?
Maths-General
Maths-
Three bricklayers, Maric, Hugh and Ethan, are cladding a new home. If Maric were to work alone, the job would take him 8 days to complete. If Hugh were to work alone, the job would take him 6 days to complete and if Ethan were to work by himself, the job would take him 12 days to complete. a) If the three men work together, how long will it take them to complete the job? b) What fraction of the house will each bricklayer complete?
Three bricklayers, Maric, Hugh and Ethan, are cladding a new home. If Maric were to work alone, the job would take him 8 days to complete. If Hugh were to work alone, the job would take him 6 days to complete and if Ethan were to work by himself, the job would take him 12 days to complete. a) If the three men work together, how long will it take them to complete the job? b) What fraction of the house will each bricklayer complete?
Maths-General
Maths-
A can do a piece of work in 40 days and B in 45 days. They work together for 10 days and then B goes away. In how many days will A finish the remaining work?
A can do a piece of work in 40 days and B in 45 days. They work together for 10 days and then B goes away. In how many days will A finish the remaining work?
Maths-General
Maths-
A and B can do a piece of work in 20 days and B in 15 days. They work together for 2 days and then A goes away. In how many days will B finish the remaining work?
A and B can do a piece of work in 20 days and B in 15 days. They work together for 2 days and then A goes away. In how many days will B finish the remaining work?
Maths-General
Maths-
Simplify
Simplify
Maths-General
Maths-
A and B can finish a work in 20 days. A alone can do 1/5th of the work in 12 days. In how many days can B alone do it?
A and B can finish a work in 20 days. A alone can do 1/5th of the work in 12 days. In how many days can B alone do it?
Maths-General
Maths-
8 bags of cattle feed are needed to feed 4 cows for 2 months. How long will the same feed last to feed 6 cows?
8 bags of cattle feed are needed to feed 4 cows for 2 months. How long will the same feed last to feed 6 cows?
Maths-General
Maths-
A and B can polish the floors of a building in 10 days. A alone can do ¼th of it in 12 days. In how many days can B alone polish the floor?
A and B can polish the floors of a building in 10 days. A alone can do ¼th of it in 12 days. In how many days can B alone polish the floor?
Maths-General
Maths-
A, B and C can reap a field in 15 ¾ days; B, C and D in 14 days; C, D and A in 18 days; D, A and B in 21 days. In what time can A, B, C and D together reap it?
A, B and C can reap a field in 15 ¾ days; B, C and D in 14 days; C, D and A in 18 days; D, A and B in 21 days. In what time can A, B, C and D together reap it?
Maths-General
Maths-
A rope makes 260 rounds of a cylinder with a base radius 20 cm. How many times can it go round a cylinder with a base radius 26cm?
A rope makes 260 rounds of a cylinder with a base radius 20 cm. How many times can it go round a cylinder with a base radius 26cm?
Maths-General
Maths-
A and B can do a piece of work in 12 days; B and C in 15 days; C and A in 20 days. How much time will A alone take to finish the work?
A and B can do a piece of work in 12 days; B and C in 15 days; C and A in 20 days. How much time will A alone take to finish the work?
Maths-General
Maths-
A and B can do a piece of work in 18 days; B and C in 24 days and A and C in 36 days. In what time can they do it, all working together?
A and B can do a piece of work in 18 days; B and C in 24 days and A and C in 36 days. In what time can they do it, all working together?
Maths-General